3 Steps to Building a Wind Farm

Date:


 

Take a closer look at renewable wind energy through the BBC’s science correspondent David Shukman’s ‘three step guide to the challenges, costs and construction of an offshore wind farm‘.

AREVA also plays a major role in offshore wind through the design, manufacture, assembly and commissioning of high-power wind turbines specially adapted for marine use, notably the M5000. In the summer of 2009, AREVA installed the first six of these M5000 turbines as part of the Alpha Ventus Project in the North Sea.

Click here to watch the video.

Share this post

Share post:

Subscribe

Popular

More like this
Related